the find of the century (not Jerry Orbach), two 4 pound balls for $1.52 each.
|
now we have an adjustable release pin.. better than pulling out the bernz-o-matic and bending 1/4 inch steel.. hopefully.
|
we added these supports to the sloped rails... they sure look stronger.
|
here's how we're attaching the pulleys to the top of the CW tower.
|
these pulleys are at the top of the CW tower.
|
another shot of the amazingly misinstalled winch.
|
here's the new power plant... too bad it's in the wrong spot.
|
more of the breakage after taking apart the arm.
|
uninsulated building... wicked cold.
|
$100 worth of new hardware.. note the ruthless winch!
|
the remains of our very first projectile...
|
a shot of the disassembled treb.
|
failed CW axel assembly
|
shot of the poorly designed rail that led to catastrophic failure. (and we all know who the "designer" is)
|
another shot of the busted rail
|
|